Street/Utility Plans |
Filename |
Description |
Date |
SU-01 |
Poured Monument |
6/09/2009 |
SU-02 |
Precast Concrete Monument |
6/09/2009 |
SU-03 |
Cement Concrete Curb and Gutter and Asphalt Wedge Curb |
8/16/2016 |
SU-03A |
Cement Concrete Curb and Gutter and Asphalt Wedge Curb |
8/16/2016 |
SU-04 |
Cement Concrete Sidewalk |
8/16/2016 |
SU-04a |
Ballasted Cement Concrete Sidewalk |
4/4/2016 |
SU-04b(1) |
Pervious Concrete Sidewalk |
4/4/2016 |
SU-04b(2) |
Pervious Concrete Sidewalk |
4/4/2016 |
SU-05 |
Curb Ramp Details, General Information |
8/16/2016 |
SU-05A |
Perpendicular Curb Ramp, Type 'A' |
8/16/2016 |
SU-05B |
Perpendicular Curb Ramp, Type 'B' |
8/16/2016 |
SU-05C |
Combination Curb Ramp |
8/16/2016 |
SU-05D |
Parallel Curb Ramp, Type 'A' |
8/16/2016 |
SU-05E |
Parallel Curb Ramp, Type 'B' |
8/16/2016 |
SU-05F |
Single Direction Curb Ramp |
8/16/2016 |
SU-05G |
Detectable Warning Surface Details |
8/16/2016 |
SU-05H |
Detectable Warning Surface Placement Guidelines |
8/16/2016 |
SU-05I |
PROWAG Guidelines, Typical Perpendicular Curb Ramp Design Standards |
4/1/2011 |
SU-05J |
PROWAG Guidelines, Typical Parallel Curb Ramp Design Standards |
4/1/2011 |
SU-06 |
Minimum Sidewalk Width at Obstructions |
8/16/2016 |
SU-07 |
Cement Concrete Access Type 1 |
4/4/2016 |
SU-08 |
Cement Concrete Access Type 2 |
4/4/2016 |
SU-09 |
Cement Concrete Access Type 3 |
4/4/2016 |
SU-10 |
Cement Concrete Stairway |
11/30/2010 |
SU-11 |
Stairway Handrail |
6/12/2009 |
SU-12 |
Bollard Details |
6/12/2009 |
SU-13 |
End of Road Marker |
6/12/2009 |
SU-14a |
Typical Pavement Restoration for Asphalt Over Cement Concrete Base Pavement |
11/30/2010 |
SU-14b |
Typical Pavement Restoration for Asphalt Over Rigid Base Brick or Stone Block Pavement |
11/30/2010 |
SU-14c |
Typical Pavement Restoration for Cement Concrete Pavement |
11/30/2010 |
SU-14D |
Typical Pavement Restoration for Asphalt Over Cement Concrete Base Pavement |
11/30/2010 |
SU-14e |
Typical Pavement Restoration for Asphalt Over Rigid Base Brick or Stone Block Pavement |
11/30/2010 |
SU-14F |
Typical Pavement Restoration for Pervious Concrete Pavement |
4/4/2016 |
SU-15a |
Typical Pavement Restoration for Asphalt Concrete/Oil Mat Pavement |
6/12/2009 |
SU-15b |
Typical Pavement Restoration for Asphalt Concrete/Oil Mat Pavement
(ROW POLICY EXEMPT) |
7/17/2009 |
SU-15C |
Typical Pavement Restoration for Porous Asphalt Pavement |
4/4/2016 |
SU-16 |
Pipe Bedding and Backfill for Sanitary and Storm Sewers |
8/16/2016 |
SU-17 |
Manhole Type 1 (48", 54" and 60") |
1/17/2014 |
SU-18 |
Manhole Type 2 (72" and Greater) |
1/17/2014 |
SU-19 |
Manhole Type 3 (5' Maximum Height) |
1/17/2014 |
SU-20 |
Cast-in-Place Manhole Base (0.05 MB) |
6/12/2009 |
SU-21 |
Misc Details for Manholes and Catch Basins |
6/12/2009 |
SU-22 |
Manhole Frame and Cover |
1/17/2014 |
SU-23 |
Lateral Sewer Connection to Sanitary Sewer Main |
6/12/2009 |
SU-24 |
Side Sewer Cleanout and Cover Detail |
6/12/2009 |
SU-25 |
Utility Adjustment |
4/24/2014 |
SU-26 |
Standard Procedure for Marking Construction Stakes |
6/12/2009 |
SU-27 |
Potholing |
6/12/2009 |
SU-28 |
Trench Backfill Compaction Requirements |
11/30/2010 |
SU-29 |
Storm Pipe Through Concrete Curb |
4/4/2016 |
SU-29A |
Storm Pipe Through Asphalt Wedge Curb Connection |
4/4/2016 |
SU-30 |
Cement Concrete Curb and Gutter Pan |
8/16/2016 |
SU-31A |
Permeable Roadway with Impervious Sidewalk |
4/4/2016 |
SU-31b |
Permeable Roadway with Pervious Sidewalks |
4/4/2016 |
SU-31c |
Permeable Roadway with Planting Strip |
4/4/2016 |
SU-32 |
Permeable Pavement Terraced Subgrade |
4/4/2016 |
SU-33 |
Trench Dam |
4/4/2016 |
SU-34 |
Sign Post Installation |
4/4/2016 |
SU-35 |
Permanent Roadway Terminus Type 3 Barricade |
4/4/2016 |
Traffic Signal Plans |
Filename |
Description |
Date |
TS-01 |
Vehicle Traffic Signal (Single & Multiple) Hanger Assembly |
2/11/2003 |
TS-02 |
Span Wire Strain Clamp |
2/11/2003 |
TS-03 |
H-Type Pedestrian Push Button Assembly |
2/11/2003 |
TS-04 |
Span Wire Detail |
2/11/2003 |
TS-05 |
Riser Assembly Underground Service Conduit |
8/31/2007 |
TS-06 |
Riser Assembly Communication Signal Conduit |
2/11/2003 |
TS-07 |
Streetlight Mast Arm Mounting Flange Detail |
2/11/2003 |
TS-08 |
Junction Box Installation Typical |
3/11/2004 |
TS-09 |
Strain Pole Standard Foundation |
3/10/2003 |
TS-10 |
Foundation & Apron for "M" & "P" Controller Cabinets |
9/14/2004 |
TS-11 |
Induction Loop Details |
2/24/2006 |
TS-12 |
Pedestrian Signal Clamshell Pole Mounting Detail |
2/12/2003 |
TS-13 |
Vehicle Signal Head Pole Mount Detail |
2/12/2003 |
TS-14 |
Standards for Signal Placement |
2/12/2003 |
TS-15 |
Traffic Signal Phase Orientation |
2/24/2006 |
TS-16 |
Vehicle Induction Loop Typical Layout |
2/12/2003 |
TS-17 |
Standard Type Designations and Type PPB, PS, I, RM & FB Details |
3/10/2003 |
Green Stormwater Infrastructure |
Filename |
Description |
Date |
GSI-01a |
BMP L613 Post Construction Soil Quality and Depth Option 1 – No Disturbance |
4/4/2016 |
GSI-01b |
BMP L613 Post Construction Soil Quality and Depth Option 2 – Amend in Place |
4/4/2016 |
GSI-01c |
BMP L613 Post Construction Soil Quality and Depth Option 3 – Stockpile and Amend |
4/4/2016 |
GSI-01d |
BMP L613 Post Construction Soil Quality and Depth Option 4 – Imported Topsoil |
4/4/2016 |
GSI-02 |
Observation / Monitoring Ports for Stormwater Facilities |
4/4/2016 |
GSI-03a |
Bioretention Section |
4/4/2016 |
GSI-03b |
Bioretention Section with Underdrain |
4/4/2016 |
GSI-03c |
Bioretention Section with Liner and Underdrain |
4/4/2016 |
GSI-04 |
Bioretention Transition Zone Sections |
4/4/2016 |
GSI-05a |
Bioretention with Sloped Sides and Sloped Bottom Plan and Longitudinal Section |
4/4/2016 |
GSI-05b |
Bioretention with Sloped Sides and Level Bottom Plan and Longitudinal Section |
4/4/2016 |
GSI-06a(1) |
Walled Bioretention with Parking – Plan View |
4/4/2016 |
GSI-06a(2) |
Walled Bioretention with Parking – Section View |
4/4/2016 |
GSI-06b(1) |
Walled Bioretention without Parking – Plan View |
4/4/2016 |
GSI-06b(2) |
Walled Bioretention without Parking – Section View |
4/4/2016 |
GSI-06c(1) |
Walled Bioretention for Building Downspouts Plan View |
4/4/2016 |
GSI-06c(2) |
Walled Bioretention Section View |
4/4/2016 |
GSI-06c(3) |
Walled Bioretention Section View |
4/4/2016 |
GSI-06c(4) |
Bioretention Planter Adjacent to Building – Section View |
4/4/2016 |
GSI-06c(5) |
Bioretention Planter Adjacent to Building – Section View |
4/4/2016 |
GSI-06d |
Walled Bioretention Walls and Structural Footing |
4/4/2016 |
GSI-06e |
Walled Bioretention Structural Buttress / Weir |
4/4/2016 |
GSI-07 |
Curb Bulbout Bioretention with Sloped Sides |
4/4/2016 |
GSI-08 |
Bulbout (In-line) Curb Cut |
4/4/2016 |
GSI-09a |
Curb Cut for Facility with Graded Side Slopes |
4/4/2016 |
GSI-09b |
Curb Cut at Walled Facility |
4/4/2016 |
GSI-10a |
Inlet Trench Drain into Sloped Facility |
4/4/2016 |
GSI-10b |
Trench Drain into Walled Bioretention |
4/4/2016 |
GSI-11a |
Stormwater Sediment Forebay with Concrete Trough |
4/4/2016 |
GSI-11b |
Stormwater Energy Dissipator with Piped Inlet |
4/4/2016 |
GSI-12 |
Presettling Cell with Pipe or Curb Cut |
4/4/2016 |
GSI-13 |
Overflow Outlet Structure |
4/4/2016 |
GSI-013 |
Rain Garden Piped Inlet |
9/1/2016 |
GSI-14 |
Overflow Outlet Structure for Smaller Facilities |
4/4/2016 |
GSI-15 |
Green Stormwater Infrastructure Outlet Control |
4/4/2016 |
GSI-16 |
Boulder Weir |
4/4/2016 |
GSI-17 |
Permeable Pavement Overflow Infiltration Gallery |
4/4/2016 |
GSI-017 |
Permeable Driveway |
9/1/2016 |
GSI-18 |
Green Stormwater Infrastructure Edge Treatment |
4/4/2016 |
GSI-19 |
Paved Surface Sheet Flow to Stormwater Facility |
4/4/2016 |
GSI-20a |
Planting Zone Diagram Bioretention with Side Slopes |
4/4/2016 |
GSI-20b |
Planting Zone Diagram Bioretention with Vertical Walls |
4/4/2016 |
GSI-21a |
Tree Planting on Bioretention Cell Edge Adjacent to Sidewalk |
4/4/2016 |
GSI-21b |
Tree Planting in Bioretention Cell Edge Adjacent to Curb |
4/4/2016 |
GSI-22 |
Storm Cleanout in Vegetated Facility |
4/4/2016 |